please, hold the mouse on the logo | Berlin [lrt-tram] Country: Germany
Line: M1, M2, M4, M5, M6, M8, M10, M13, M17, Line 12, Line 16, Line 18, Line 21, Line 27, Line 37, Line 50, Line 60, Line 61, Line 62, Line 63, Line 67, Line 68
Inhabitants: City 3500000 District 3700000
|
DESCRIPTION Berlin tram network opened in 1865 (horse tram) and it was totally electrified in 1902.
Tram system reached its maximum extension in 1929 (89 lines, 634 km). Due to the "cold war", the system was splitted in 2 parts: in the western side most of the lines were closed or dismantled, while in the eastern part the complete elimination of the city's tram network wasn't considered. The current tram network consists in 22 lines.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1865 | initial horse tram opening | -- | 1902 | electrification completed | -- | 1929 | network max extension: 89 lines;634 km | -- | 1953 | network splitted in 2 separate parts:Berlin West/Berlin East | -- | 1988 | Prerower Platz-Falkenberg | -- | 1991 | Zossener Strasse-U Hellersdorf-Riesaer Strasse | -- | 14-10-1995 | Bjornsonstrasse-Osloer Strasse | -- | 25-10-1997 | Osloer Strasse-Virchow Klinikum | -- | 20-12-1997 | Oranienburger Tor-Universitatsstrasse | -- | 18-12-1998 | Mollstrasse/Otto Braun Strasse;Alexanderplatz-Spandauer Strasse | -- | 28-05-2000 | Revaler Strasse-Warschauer Strasse | -- | 29-09-2000 | Franzosisch Buchholz Kirche-Guyotstrasse | -- | 28-05-2006 | Eberswalder Strasse-Nordbahnhof | -- | 30-05-2007 | Mollstraße/Prenzlauer Allee-Alexanderplatz | -- | 04-09-2011 | Adlershof-Karl Ziegler Strasse | -- | 25-08-2013 | U Naturkundemuseum-Schwartzkopffstrasse loop permanently closed | -- | 14-12-2014 | U Naturkundemuseum-Hauptbahnhof-Luneburger Strasse | -- |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) --
Single line stops --
Single line avg. distance (km) --
Total track length (km) 191.6
Total network stops 382
Avg. stop net distance (km) 0.5
Type steel wheels
Current/Voltage 600 V DC by third rail
Type of guide/gauge standard gauge rails (1435 mm)
Vehicles builder TATRA,MAN/AEG,BOMBARDIER
Model KT4D,GT6N,Flexity
Operator BERLINER VERKEHRSBETRIEBE (BVG)
| (last modified February 19, 2017 ) |
This image is shown smaller (800 x 860 pixels) than its maximum size (1800 x 1940 pixels)
Please click on the map to enlarge it to its maximum size lrt-tram - berlin; By Pechristener (Self made with OSM Data.) [CC BY-SA 2.0 (http://creativecommons.org/licenses/by-sa/2.0)], via Wikimedia Commons
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|