Information portal about all European guided public transportation systems. This site is regularly updated.
ver.5.0 © 2005-2024, Ing.Michele Tarozzi
DESCRIPTION
Samsun tram opened on October 2010, running from Gar (railway station) to Universite; it was extended on August 2016 (Gar-Tekkekoi).
(last modified February 19, 2017 )
HISTORY
datesection nameline
10-10-2010tram opening: Gar-Universite--
26-08-2016Gar-Tekkekoi--
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
--
Single line stops
--
Single line avg. distance (km)
--
Total track length (km)
30
Total network stops
35
Avg. stop net distance (km)
0.85
Type
steel wheels
Current/Voltage
750 V DC overhead
Guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
ANSALDO,CNR TANGSHAN
Model
Sirio,--
Operator
--
(last modified February 19, 2017 )
this map is shown here at its maximum resolution (696 x 619)


report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


LRT-TRAM Samsun PHOTO
pictures found on server: 5
click on a picture to enlarge it
Total size of this site MB 268