please, hold the mouse on the logo | Botosani [lrt-tram] Country: Romania
Line: Line 100, Line 101, Line 102
Inhabitants: City 110000, District --
|
DESCRIPTION Botosani tram opened in 1991 (first section, running from the city centre to the industrial district); 4 years later the initial route has been extended with a new section from Sucevei to Primaverii Street.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1991 | Luceafarul-S.A. Mobila | -- | 1995 | Eminescu-Botosani Gara CFR | -- |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) --
Single line stops --
Single line avg. distance (km) --
Total track length (km) 8
Total network stops 15
Avg. stop net distance (km) 0.55
Type steel wheels
Current/Voltage 750 V DC overhead
Guide/gauge standard gauge rails (1435 mm)
Vehicles builder TATRA,PESA
Model KT4D,KT4DM,120Nc
Operator SC ELTRANS SA
| (last modified February 19, 2017 ) |
this map is shown here at its maximum resolution (500 x 356)
lrt-tram - botosani; By Metrotram.it
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
LRT-TRAM Botosani PHOTO pictures found on server: 2
click on a picture to enlarge it Total size of this site MB 268
|