please, hold the mouse on the logo | Konya [lrt-tram] Country: Turkey
Line: Line 1, Line 2
Inhabitants: City 970000, District --
|
DESCRIPTION Konya tram opened in 1992 running from Alaaddin (south) to S. Univerversitesi Fakulteler (north). A southern extension was completed on September 2015 (Alaaddin-Adlyie).
The current tram service is organized in 2 routes (Line 1, Line 2).
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1992 | Alaaddin-Fen Edebyat Fakultelesi | Line 1 | 29-09-2015 | Alaaddin-Adlyie | Line 2 |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) --
Single line stops --
Single line avg. distance (km) --
Total track length (km) 22.4
Total network stops 40
Avg. stop net distance (km) 0.60
Type steel wheels
Current/Voltage 750 V DC overhead
Guide/gauge standard gauge rails (1435 mm)
Vehicles builder SKODA
Model 28T
Operator --
| (last modified February 19, 2017 ) |
this map is shown here at its maximum resolution (399 x 798)
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|