Official Logo | Istanbul [lrt-tram] Country: Turkey
Line: modern tram: T1, T4 heritage tram: T2, T3
Inhabitants: City 14000000, District 14400000
|
DESCRIPTION Istanbul first tram line opened in 1869 (initial horse tram); it was electrified in 1914. As well as in other towns, the original tram system was dismantled after the second world war (in 1961 tram closed in the european part of Istanbul, in 1966 tram closed in the asiatic one). Parts of the old tram routes have been reopened (operating as a heritage/touristic trams) both in the european side (1990: tram T2 running from the top station of the Tunel Funicular to Taksim Square) and in the asiatic side (2003: T3 circular line, Kadikoy-Damga Sokak-Kadikoy). T1 interchanges with metro M1 (at Bagcilar, Zeytinburnu, Yusufpasa) and metro M2 (at Vezneciler).
The first modern LRT/tram line (T1) opened in 1992, running from Sirkeci to Topkapi; it was extended in 1994 (Topkapi-Zeytinburnu), 1996 (Sirkeci-Eminonu), 2005 (Eminonu-Findikli) and 2006 (Findikli-Kabatas; Zeytinburnu-Bagcilar).
A second modern LRT/tram line (T4) opened in 2007 running from Sehitlik to Mescid-i Selam; it was extended in 2009 (Sehitlik-Topkapi). T4 and T1 interchange at Topkapi.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1869 | initial horse tram opening | -- | 1914 | electrification completed in the European side | -- | 1928 | electrification completed in the Asian side | -- | 1961 | tram network closure in the European sid | -- | 1966 | tram network closure in the Asian sid | -- | 1992 | Sirkeci-Topkapi | T1 | 1994 | Topkapi-Zeytinburnu | T1 | 1996 | Sirkeci-Eminonu | T1 | 30-01-2005 | Eminonu-Findikli | T1 | 2006 | Findikli-Kabatas | T1 | 2006 | Zeytinburnu-Bagcilar | T1 | 1990 | Taksim-Beyoglu | T2 | 01-11-2003 | Kadikoy-Moda | T3 | 10-09-2007 | Sehitlik-Mescid-i Selam | T4 | 18-03-2009 | Sehitlik-Topkapi | T4 |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) T1:18.5 T2:1.7 T3:2.6 T4:15.3
Single line stops T1:31 T2:5 T3:10 T4:22
Single line avg. distance (km) T1:0.6 T2:0.4 T3:0.3 T4:0.75
Total track length (km) 38.1
Total network stops 68
Avg. stop net distance (km) 0.55
Type steel wheels
Current/Voltage T1,T4:750 V DC overhead T2,T3:--
Guide/gauge T1,T4:standard gauge rails (1435 mm) T2,T3:metric gauge rails (1000 mm)
Vehicles builder T1:BOMBARDIER,ALSTOM T2:-- T3:REICHSBAHNAUSBESSRUNGSWERK BERLIN-SCHONEWEIDE,GOTHAER WAGGONFABRIK T4:ABB,DUEWAG,HYUNDAI ROTEM
Model T1:Flexity Swift,Citadis T2:-- T3:Rekowagen,Gotha T57 T4:LRV,KTA,LRV34
Operator ISTANBUL ULASIM
| (last modified February 19, 2017 ) |
This image is shown smaller (800 x 567 pixels) than its maximum size (3500 x 2476 pixels)
Please click on the map to enlarge it to its maximum size lrt-tram - istanbul; By R1410 (Own work) [CC BY-SA 3.0 (http://creativecommons.org/licenses/by-sa/3.0)], via Wikimedia Commons
|