DESCRIPTION
The first line (Line 1) of a new LRT system opened in Cagliari on 17-03-2008, connecting Cagliari (P.zza Repubblica terminal) to the neighboring agglometration of Monserrato (S. Gottardo terminal); Line 1 was extended on 14-02-2015 from Monserrato San Gottardo to Policlinico.
The second line (Line 2) opened on 13-04-2015 running from Monserrato San Gottardo (where it interchanges with Line 1) to Settimo San Pietro.
Both lines are mostly single track (with intermediate by-passes at the stops); they run almost totally ground level (except for the elevated section between San Gottardo and Policlinico) with priority at crossroads (regulated by traffic lights).
Cagliari P.zza Repubblica-Monserrato San Gottardo section was obtained by the reconversion of the urban segment of Cagliari-Isili railway line (now terminating at Monserrato San Gottardo); Line 2 alignment is served both by tramcars and local trains (serving Cagliri-Isili railway route), in tram-train mode.
(last modified February 19, 2017 )
HISTORY
datesection nameline
17-03-2008P.zza Repubblica-Monserrato S. GottardoLine 1
14-02-2015Monserrato San Gottardo-PoliclinicoLine 1
13-04-2015Monserrato San Gottardo-Settimo San PietroLine 2
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
--
Single line stops
--
Single line avg. distance (km)
--
Total track length (km)
12
Total network stops
13
Avg. stop net distance (km)
1.0
Type
steel wheels
Current/Voltage
750 V DC overhead
Type of guide/gauge
950 mm gauge rails
Vehicles builder
SKODA
Model
06T modified
Operator
ARST
(last modified February 19, 2017 )
this map is shown here at its maximum resolution (800 x 970)


lrt-tram - cagliari; By Roberto Mura (Own work) [CC BY-SA 4.0 (http://creativecommons.org/licenses/by-sa/4.0)], via Wikimedia Commons
report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


LRT-TRAM Cagliari PHOTO
pictures found on server: 6
click on a picture to enlarge it
Total size of this site MB 268