please, hold the mouse on the logo | Cagliari [lrt-tram] Country: Italy
Line: Tram:Line 1 Tram-train (track sharing):Line 2
Inhabitants: City 160000, District --
|
DESCRIPTION The first line (Line 1) of a new LRT system opened in Cagliari on 17-03-2008, connecting Cagliari (P.zza Repubblica terminal) to the neighboring agglometration of Monserrato (S. Gottardo terminal); Line 1 was extended on 14-02-2015 from Monserrato San Gottardo to Policlinico.
The second line (Line 2) opened on 13-04-2015 running from Monserrato San Gottardo (where it interchanges with Line 1) to Settimo San Pietro.
Both lines are mostly single track (with intermediate by-passes at the stops); they run almost totally ground level (except for the elevated section between San Gottardo and Policlinico) with priority at crossroads (regulated by traffic lights).
Cagliari P.zza Repubblica-Monserrato San Gottardo section was obtained by the reconversion of the urban segment of Cagliari-Isili railway line (now terminating at Monserrato San Gottardo); Line 2 alignment is served both by tramcars and local trains (serving Cagliri-Isili railway route), in tram-train mode.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 17-03-2008 | P.zza Repubblica-Monserrato S. Gottardo | Line 1 | 14-02-2015 | Monserrato San Gottardo-Policlinico | Line 1 | 13-04-2015 | Monserrato San Gottardo-Settimo San Pietro | Line 2 |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) --
Single line stops --
Single line avg. distance (km) --
Total track length (km) 12
Total network stops 13
Avg. stop net distance (km) 1.0
Type steel wheels
Current/Voltage 750 V DC overhead
Type of guide/gauge 950 mm gauge rails
Vehicles builder SKODA
Model 06T modified
Operator ARST
| (last modified February 19, 2017 ) |
this map is shown here at its maximum resolution (800 x 970)
lrt-tram - cagliari; By Roberto Mura (Own work) [CC BY-SA 4.0 (http://creativecommons.org/licenses/by-sa/4.0)], via Wikimedia Commons
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|