DESCRIPTION Kayseri tram (Kaysersay) opened on August 2009, running from Oraganize Sanayi to Dogu Terminali. It was extended in 2014 (Dogu Terminali-Ildem 5; Erciyesevler-Erciyes Universitesi/Lojmanlar; Erciyes Universitesi/Lojmanlar-Talas/Cemilbaba).
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 01-08-2009 | Oraganize Sanayi-Dogu Terminali | -- | 01-02-2014 | Dogu Terminali-Ildem 5 | -- | 14-02-2014 | Erciyesevler-Erciyes Universitesi/Lojmanlar | -- | 25-10-2014 | Erciyes Universitesi/Lojmanlar-Talas/Cemilbaba | -- |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) --
Single line stops --
Single line avg. distance (km) --
Total track length (km) 34.4
Total network stops 55
Avg. stop net distance (km) 0.65
Type steel wheels
Current/Voltage 750 V DC overhead
Guide/gauge standard gauge rails (1435 mm)
Vehicles builder ANSALDO
Model Sirio
Operator KAYSERI BUYUKSEHIR BELEDIYESI
| (last modified February 19, 2017 ) |