please, hold the mouse on the logo | Brno [lrt-tram] Country: Czech Republic
Line: Line 1, Line 2, Line 3, Line 4, Line 5, Line 6, Line 7, Line 8, Line 9, Line 10, Line 11, Line 12, Line 13
Inhabitants: City 380000, District 810000
|
DESCRIPTION Brno tram opened in 1869 (initial horse tram) and from that date it has been continuosly in service. Steam trams operated in 1884-1890, before the complete electrification (1900).
The current tram network consists in 13 lines.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1869 | initial horse tram opening | -- | 1884-1900 | steam tram operation | -- | 1900 | electrification completed | -- |
(last modified February 19, 2017 )
| TECHNICAL DATA Under construction sections: --
Single line length (Km) --
Single line stops --
Avg. distange (km) --
Total track length (km) 70.4
Total network stops 143
Avg. stop net distance (km) 0.5
Type steel wheels
Current/Voltage 600 V DC overhead
Type of guide/gauge standard gauge rails (1435 mm)
Vehicles builder TATRA,SKODA
Model T3,K2,KT8D5,T6A5,Vario LF,Vario LF2,VV60LF,03T,13T
Operator DOPRAVNI PODNIK MESTA BRNA
| (last modified February 19, 2017 ) |
This image is shown smaller (800 x 552 pixels) than its maximum size (1200 x 825 pixels)
Please click on the map to enlarge it to its maximum size lrt-tram - brno; By Brno_tramvaje_2009.png: User:Gaj777 on the basic map by User:Harold17 derivative work: Gombarix (Brno_tramvaje_2009.png) [CC BY-SA 3.0 (http://creativecommons.org/licenses/by-sa/3.0), GFDL (http://www.gnu.org/copyleft/fdl.html), GFDL (http://www.gnu.org/copyleft/fdl.html) or CC BY-SA 3.0 (http://creativecommons.org/licenses/by-sa/3.0)], via Wikimedia Commons
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|