DESCRIPTION
Rome metro network is articulated in 3 lines (Line A, Line B, Line C).
Line B opened in 1955 (Termini-Laurentina) and it was extended in 1990 (Termini-Rebibbia), 2012 (Bologna-Conca d'Oro) and 2015 (Conca d'Oro-Jonio). Line B currently runs from Laurentina to Rebibbia, with an intermediate branch from Bologna to Conca d'Oro (the so called "Line B1").
Line A opened in 1980 (Ottaviano-Cinecittà, Cinecittà-Anagnina); although works began in 1964, the first section was completed only in 1980 due to many technical and archaeological problems (initially it was chosen the "cut&cover" technique, but years later works were completed with the TBM/bored tunnel method). Line A was extended in 1999 (Ottaviano-Valle Aurelia) and 2000 (Valle Aurelia-Battistini); it currently runs from Battistini to Anagnina, serving Roma Termini railway station (where it also interchanges with Line B).
The third line (Line C, driverless metro) opened on November 2014 (Parco di Centocelle-Monte Compatri/Pantano) and it was extended in 2015 (Parco di Centocelle-Lodi) and 2018 (Lodi-San Giovanni). Line C runs underground from San Giovanni to east of Giardinetti stop, then it procedes ground level up to Monte Compatri/Pantano terminal (along the track of the former Roma-Fiuggi local railway).
(last modified June 26, 2018 )
HISTORY
datesection nameline
19-02-1980Ottaviano-CinecittàLine A
11-06-1980Cinecittà-AnagninaLine A
29-05-1999Ottaviano-Valle AureliaLine A
01-01-2000Valle Aurelia-BattistiniLine A
09-02-1955Termini-LaurentinaLine B
08-12-1990Termini-RebibbiaLine B
13-06-2012Bologna-Conca d'OroLine B
21-04-2015Conca d'Oro-JonioLine B
09-11-2014Parco di Centocelle-Monte Compatri/PantanoLine C
29-06-2015Parco di Centocelle-LodiLine C
12-05-2018Lodi-San GiovanniLine C
(last modified June 26, 2018 )
TECHNICAL DATA
Single line length (Km)
Line A:18.4
LineB:22.9
Line C:18.1
Single line stops
Line A:27
LineB:26
Line C:22
Single line avg. distance (km)
Line A:0.9
LineB:
Line C:0.9
Total track length (km)
59.4
Total network stops
75
Avg. stop net distance (km)
0.80
Type
steel wheels
Current/Voltage
1500 V DC overhead
Type of guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
Line A:CAF
Line B:CAF; ANSALDOBREDA
Line C:ANSALDOBREDA
Model
Line A:S/300
Line B:S/300;MB100
Line C:--
Operator
ATAC


(DLM = Driverless Metro)
(last modified June 26, 2018 )
This image is shown smaller (800 x 537 pixels) than its maximum size (1300 x 874 pixels)
Please click on the map to enlarge it to its maximum size


metro - rome; By Arbalete [CC BY-SA 4.0 (https://creativecommons.org/licenses/by-sa/4.0)], from Wikimedia Commons
report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


METRO Rome PHOTO
pictures found on server: 9
click on a picture to enlarge it
Total size of this site MB 268