Line: Metro:Line A, Line B;DLM:Line C
Inhabitants: City 2900000, District 4300000
|
DESCRIPTION Rome metro network is articulated in 3 lines (Line A, Line B, Line C).
Line B opened in 1955 (Termini-Laurentina) and it was extended in 1990 (Termini-Rebibbia), 2012 (Bologna-Conca d'Oro) and 2015 (Conca d'Oro-Jonio). Line B currently runs from Laurentina to Rebibbia, with an intermediate branch from Bologna to Conca d'Oro (the so called "Line B1").
Line A opened in 1980 (Ottaviano-Cinecittà, Cinecittà-Anagnina); although works began in 1964, the first section was completed only in 1980 due to many technical and archaeological problems (initially it was chosen the "cut&cover" technique, but years later works were completed with the TBM/bored tunnel method). Line A was extended in 1999 (Ottaviano-Valle Aurelia) and 2000 (Valle Aurelia-Battistini); it currently runs from Battistini to Anagnina, serving Roma Termini railway station (where it also interchanges with Line B).
The third line (Line C, driverless metro) opened on November 2014 (Parco di Centocelle-Monte Compatri/Pantano) and it was extended in 2015 (Parco di Centocelle-Lodi) and 2018 (Lodi-San Giovanni). Line C runs underground from San Giovanni to east of Giardinetti stop, then it procedes ground level up to Monte Compatri/Pantano terminal (along the track of the former Roma-Fiuggi local railway).
(last modified June 26, 2018 )
HISTORYdate | section name | line | | 19-02-1980 | Ottaviano-Cinecittà | Line A | 11-06-1980 | Cinecittà-Anagnina | Line A | 29-05-1999 | Ottaviano-Valle Aurelia | Line A | 01-01-2000 | Valle Aurelia-Battistini | Line A | 09-02-1955 | Termini-Laurentina | Line B | 08-12-1990 | Termini-Rebibbia | Line B | 13-06-2012 | Bologna-Conca d'Oro | Line B | 21-04-2015 | Conca d'Oro-Jonio | Line B | 09-11-2014 | Parco di Centocelle-Monte Compatri/Pantano | Line C | 29-06-2015 | Parco di Centocelle-Lodi | Line C | 12-05-2018 | Lodi-San Giovanni | Line C |
(last modified June 26, 2018 )
| TECHNICAL DATA Single line length (Km) Line A:18.4 LineB:22.9 Line C:18.1
Single line stops Line A:27 LineB:26 Line C:22
Single line avg. distance (km) Line A:0.9 LineB: Line C:0.9
Total track length (km) 59.4
Total network stops 75
Avg. stop net distance (km) 0.80
Type steel wheels
Current/Voltage 1500 V DC overhead
Type of guide/gauge standard gauge rails (1435 mm)
Vehicles builder Line A:CAF Line B:CAF; ANSALDOBREDA Line C:ANSALDOBREDA
Model Line A:S/300 Line B:S/300;MB100 Line C:--
Operator ATAC
(DLM = Driverless Metro) | (last modified June 26, 2018 ) |
This image is shown smaller (800 x 537 pixels) than its maximum size (1300 x 874 pixels)
Please click on the map to enlarge it to its maximum size metro - rome; By Arbalete [CC BY-SA 4.0 (https://creativecommons.org/licenses/by-sa/4.0)], from Wikimedia Commons
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|