please, hold the mouse on the logo | Frankfurt [metro] Country: Germany
Line: tram: Line 11, Line 12, Line 14, Line 15, Line 16, Line 17, Line 18, Line 19, Line 20, Line 21 premetro: Route A: U1, U2, U3, U8; Route B: U4, U5; Route C: U6, U7; Route D: U9 [stadtbahn]
Inhabitants: City 640000, District 1900000
|
DESCRIPTION The first Frankfurt tram line opened in 1872; electrification took place in 1884. Starting from years '60s, the tram system was completed upgrading part of the network to premetro/Stadtbahn standards (combining ground level and underground sections); the first premetro section opened in 1968 ( Hauptwache-Nordweststadt) followed by many further extensions (in 1974, 1980, 1984, 1986, 1992, 1999, 2001, 2008, 2010). The current network consists in 10 tram lines and 9 premetro lines.
(last modified February 19, 2017 )
HISTORYdate | section name | line | | 1872 | original street-level tram alignment | -- | 1894 | beginning of network electrification | -- | 1968 | Hauptwache-Nordweststadt | premetro | 1974 | Konstablerwache-Hauptbahnhof tunnel | premetro | 1980 | Konstablerwache-Seckbacher Landstrasse | premetro | 1984 | Hauptwache-Sudbahnhof tunnel | premetro | 1986 | Industriehof/Neue Borse-Zoo tunnel | premetro | 1992 | Zoo-Enkheim | premetro | 1999 | Borneplatz-Konstablerwache-Hessendenkmal | -- | 1999 | Zoo-Ostbahnhof | premetro | 2001 | Hauptbahnhof-Bockenheimer Warte tunnel | premetro | 2003 | Varrentrappstrasse-Rebstockbad | -- | 2008 | Seckbacher Landstrasse-Schafflestrasse | premetro | 2010 | Niederursel-Riedberg-Kalbach | premetro | 11-12-2011 | Rohrbachstrasse/Friedberger Landstrasse-Preungesheim/Gravensteiner Platz | -- | 14-12-2014 | Stresemannallee/Gartenstrasse-Stresemannallee/Morfelder Landstrasse | -- |
(last modified February 19, 2017 )
| TECHNICAL DATA Single line length (Km) tram: 63.6 premetro: U1:12.4 U2:16.7 U3:19.4 U4:11.2 U5:7.8 U6:7.7 U7:11.9 U8:12.3 U9:10.3
Single line stops tram: 127 premetro: U1:20 U2:21 U3:28 U4:15 U5:16 U6:14 U7:20 U8:19 U9:12
Single line avg. distance (km) tram: 0.5 premetro: U1:0.65 U2:0.85 U3:0.7 U4:0.8 U5:0.5 U6:0.55 U7:0.6 U8:0.7 U9:0.95
Total track length (km) 128.6
Total network stops 213
Avg. stop net distance (km) 0.60
Type steel wheels
Current/Voltage 600 V DC overhead
Type of guide/gauge standard gauge rails (1435 mm)
Vehicles builder tram: DUEWAG/SIEMENS; BOMBARDIER premetro: DUEWAG
Model tram: Type R; Type S premetro: U1-wagen,U2-wagen,U3-wagen,U4-wagen,U5 wagen
Operator STADTWERKE VERKEHRSGESELLSCHAFT FRANKFURT AM MAIN MBH
NOTE tram system: 78 km (127 stops) premetro system: 65 km (86 stops)
| (last modified February 19, 2017 ) |
This image is shown smaller (800 x 762 pixels) than its maximum size (1200 x 1141 pixels)
Please click on the map to enlarge it to its maximum size metro - frankfurt; By NordNordWestOpenStreetMap contributors (OpenStreetMapopenstreetmap.org) [CC BY-SA 2.0 (http://creativecommons.org/licenses/by-sa/2.0)], via Wikimedia Commons
|
|
LATEST UPDATES TO THIS SITEapm | 19-02-2017 | lrt-tram | 27-06-2018 | metro | 26-06-2018 | funicular | 20-02-2017 | news | 20-02-2017 |
Total size of this site MB 268
|