Information portal about all European guided public transportation systems. This site is regularly updated.
Izmir METRO (photo N.3/6 [KB 74] 800 x 531pixels)
   

by izmirmetro.com


DESCRIPTION
Izmir Metro opened in 2000 running south west-north east; the track combines underground, elevated and ground level sections.
The system has been costantly extended (in 2012, 2014 and 2016) while further extensions are considered. Metro will interchange with a future tram line (currently under construction) at Fahrettin Altay and Halkapinar stops).
(last modified February 19, 2017 )
HISTORY
datesection nameline
25-08-2000Ucyol-Bornova--
30-03-2012Bornova - Evka 3--
29-12-2012Uçyol-Hatay--
25-03-2014Hatay-Goztepe--
27-07-2014Goztepe-Fahrettin Altay--
(last modified February 19, 2017 )
TECHNICAL DATA
Single line length (Km)
--
Single line stops
--
Single line avg. distance (km)
--
Total track length (km)
20
Total network stops
17
Avg. stop net distance (km)
1.25
Type
steel wheels
Current/Voltage
750 V DC from third rail
Guide/gauge
standard gauge rails (1435 mm)
Vehicles builder
BOMBARDIER
Model
Flexity Swift
Operator
IZMIR METROSU A.S.
(last modified February 19, 2017 )
This image is shown smaller (800 x 533 pixels) than its maximum size (4082 x 2719 pixels)
Please click on the map to enlarge it to its maximum size


metro - izmir; By R1410 (Own work) [CC BY-SA 3.0 (http://creativecommons.org/licenses/by-sa/3.0)], via Wikimedia Commons
report an error

search a city

LATEST UPDATES TO THIS SITE
apm19-02-2017
lrt-tram27-06-2018
metro26-06-2018
funicular20-02-2017
news20-02-2017


METRO Izmir PHOTO
pictures found on server: 6
click on a picture to enlarge it
Total size of this site MB 268